
Description
Maximise your returns from the outputs of your BGA through improved distribution into the power grid and more comprehensive purification of methane.This is reflected in improved payouts (double standard rates) but distribution takes longer to complete.Two versions are includedNormal: £75,000Capacity:Electric Charge: 20,000KWMethane: 20,000LProcess speed:Electric Charge: 120,000KW / monthMethane: 60,000L / monthCheaty Version: £150,000Capacity:Electric Charge: 80,000KWMethane: 80,000LProcess speed:Electric Charge: 480,000KW / monthGas: 240,000L / month
Credits
Disturbed Simulations
Files
3.1 MB
Primary0 Downloads